Contact Us
Headwater Lining
265 High K Street, Belgrade
Montana 59714
Tel: 406-924-4090
Fax: 406-388-5408
Email: info@headwaterlining.com
WASTE WATER CONTAINMENT
Waste water can be treated close to where it is created, a decentralized system, or collected and transported via a network of pipes and pump stations to a municipal treatment plant, a centralized system. The Clean Water Act requires public waste water treatment plants to install geomembrane lining systems to contain waste and protect groundwater. Many local government bodies also regulate the development of private sewage systems to adhere to similar standards. Headwater Lining has established itself as a highly trusted installer of geomembrane liner within the industry. We work with both public and private entities, to create safe and reliable treatment plants and lagoons, including the industry’s highest quality leak detection systems.





